La Grande Garde

[ Mehrfamilienhaus| Siders ]

Startıng Posıtıon

The Aim Of The Study Was To Observe Scaling And Corrosion Deterioration In The Water Pipes After The Installation Of The Aqua4D® System. The Weathering Of Calcification And Corrosion Is Monitored By A Specially Designed Control Tube. A Pipe Section Of The Cold Water Mains Was Cut To Determine Its Condition Before Installation. This Pipe Section Was Then Reassembled With 2 Pipe Clamps So That It Can Be Easily Disassembled And Checked In The Future. The Location Chosen For The Control Pipe Represented The Condition Of The Pipelines Throughout The Building. The Positive Impact Of Aqua4D® At This Point Indicates That The Effectiveness Is The Same Across The Entire Pipeline. It Was Decided That The Results Of The Aqua4D® Technology Will Be Analyzed By Dismantling And Examining The Control Pipe 10 Months After Installation.

Plannıng

  • December 23, 2010 - Installation Of The Aqua4D® System
  • September 22, 2011 - P.a. Examination In The Presence. Zufferey

Solutıon

The Aqua4D® System Consists Of: 1X Command 360E Pro Controller To Which 1 X 360E Pipe Is Attached - The Tube Is Mounted After The Pressure Reducer And In Front Of The Various Exchangers. 1 X Command 60E Pro Controller To Which 1 X 60E Pipe Is Connected - The Tube Is Connected To The Hot Water Return After The Circulation Pump.

These Two Water Treatment Systems 360E Pro And 60E Pro Are Connected By A Synchronization Cable To Simultaneously Treat The Building's Cold And Hot Water.

Results

Results When The Control Tube Is Examined After Aqua4D® Has Been Operated For 10 Months: The Pipe Is Descaled Treatment With Aqua4D® Works Until Limescale Deposits Are Completely Removed (Restorative Effect) And Permanently To Prevent The Formation Of New Deposits (Preventive Effect). You Do Not Need To Use Chemicals. Pollution Is Eliminated And There Is A Low Energy Consumption.

Gallery

[Our Photos]