Art School

[Schule | Visp]

Vocational School [School | Visp] 26 June 2012, An Aqua4D® Pro 180E System

Startıng Posıtıon

To Eliminate These Problems And Ensure Optimal Protection Of The Future Sanitary Facilities, The Owner Decided To Install An Aqua4D® Water Treatment System To Combat Scale Deposits And Corrosion. The Filter Behind The Pressure Reducer Was Badly Damaged By Corrosion.

According To Plumbing Contractors, This Problem Is Common In The Region. Drinking Water In Viège Is Very Corrosive. To Eliminate These Problems And Protect The Sanitary Facilities In The Future, The Owner Decided To Install An Aqua4D® Water Treatment System To Combat Scale Deposits And Corrosion.

Plannıng

  • 26 Haziran 2012 - Viège'deki Otto Stoffel Ag'de Aqua4D® 180E Pro Sisteminin Kurulumu

Solutıon

The Aqua4D System Consists Of: 2 Tu * Aqua4D 60F - Attaches To The Cold Water Manifold After A New Pressure Reducer Is Installed. 1 Tu * Aqua4D 60F - Installed On The Hot Water Return After The Circulation Pump. 2 X 40 Cm Control Pipe - Installed Between Two Shut-Off Valves, The First Is The Cold Water Pipe And The Second Is The Hot Water Pipe. * Unité (S) De Traitement = Healing Equipment

Results

The Inspection Of The Control Pipes Was Carried Out After 21 Months Of Operation Of The Aqua4D® System Under The Control Of The Building Services Supervisor: The Pipe Has Been Descaled, The Results Are Clearly Visible Thanks To The Control Pipes. Treatment With Aqua4D® Works Until Limescale Deposits Are Completely Removed (Restorative Effect) And To Prevent The Formation Of New Deposits Permanently (Preventive Effect). See Photos Of The Control Tube.

Gallery

[Our Photos]